How-To

How to Switch from Notion to Obsidian for Note Taking

21 min read

A note app switch is a change of model as much as a change of app, and that is the first thing to understand before you move a single page, which is why how to switch from notion to obsidian for note taking starts with the model, not the import button.

Notion stores your notes as blocks in its cloud database, and you reach them through an account, a subscription and an internet connection. Obsidian stores your notes as plain Markdown files in a folder on your own device, called a vault, and you reach them with or without an account, a subscription or an internet connection.

Learning how to switch from notion to obsidian for note taking is therefore a project about files and habits, not about software, because the import is the easy part and the new habits are the hard part. A migration that moves pages without fixing links produces a vault full of broken connections, and a migration that moves databases without understanding Bases produces a vault where the structure that made Notion useful is gone. This guide walks through the switch in nine steps, with the two import routes compared, the known limits listed, a cost comparison and a rebuild checklist, using facts checked against vendor help pages and independent comparisons in late 2026.

One warning before the steps. Notion and Obsidian are closer in 2026 than they were two years ago, and the switch is not right for everyone. Obsidian now has Bases, a core plugin that shows notes as table, list, cards, kanban or map views, which closes much of the database gap. Notion now works offline with downloaded pages on desktop and mobile, which closes much of the offline gap. A person who collaborates daily with a team in shared Notion workspaces should think twice before switching, because Obsidian is built for one person and their files, not for a team editing together in real time.

How to Switch from Notion to Obsidian for Note Taking at a Glance

The short version of how to switch from notion to obsidian for note taking is that the official Importer plugin moves your pages and databases into a local vault in an afternoon, and the rest of the work is rebuilding links, templates and daily habits over the following two weeks. The table below is that process on one page, with the time each step takes for a personal workspace, because a migration without a timeline is a migration that drifts.

StepWhat happensTime for a personal workspace
1. DecideCompare the models and pick a route1 day
2. AuditList pages, databases and templates1 day
3. Back upExport the whole Notion workspace1 hour
4. InstallSet up Obsidian and the Importer plugin1 hour
5. ImportRun the API import or the HTML zip import1 to 4 hours
6. CheckFix links, images and database views1 to 2 days
7. RebuildRecreate templates, daily notes and Bases1 week
8. SyncChoose Sync, iCloud, Git or another service1 day
9. LiveWork in Obsidian daily, keep Notion as backup2 weeks

A personal workspace with a few hundred pages can finish the import in an afternoon, and a large workspace with many databases can take a day or more, because the Notion API rate limits slow the import and the checking takes longer with every database. The most common mistake is to import without a backup, because an import that goes wrong without a backup is a loss, while an import that goes wrong with a backup is a retry. Export first, import second, and keep the export until the vault is proven. That order is the simplest safety rule in how to switch from notion to obsidian for note taking.

Why People Leave Notion for Obsidian

Ownership is the reason most people cite, and it is the simplest reason to understand. Notion stores your content in its cloud, and you can export it, but the export is a snapshot, not a living copy, and the working copy lives on Notion servers. Obsidian stores your notes as plain text files on your disk, and you can open them in any editor, back them up with any tool, and read them in fifty years without Obsidian existing.

Speed and offline use are the second reason, because Obsidian works offline by default, with local files that open instantly, while Notion works online first and offline second. Notion added offline mode in August 2025, with version 2.53, and the desktop and mobile apps now work offline with pages you download. That change narrows the gap, but it does not close it, because Obsidian offline is the default state, not a mode, and it works in a plane, a tunnel or a cabin with no connection at all.

Privacy is the third reason, because local files stay on your device unless you choose to sync them, and Obsidian Sync uses end-to-end encryption by default. Notion data lives on Notion servers, and while the company protects it well, the data is not yours in the same physical sense. A researcher or a professional who keeps sensitive notes will prefer files they can see, copy and encrypt themselves.

The Two Import Routes, Compared Honestly

Obsidian official Importer plugin offers two routes, and the choice between them decides what survives the move, so pick the route before you start. The API route connects to your Notion account with an access token, and it converts pages and databases, turning databases into Obsidian Bases, which are the database views that Obsidian added as a core plugin. The file route imports a zip file from a Notion export, and it converts pages from an HTML export, but it does not keep databases as Bases. The table below compares the two routes on the facts that matter.

RouteWhat it keepsWhat it needsBest for
Notion account, APIPages, databases as Bases, formulasAccess token, internetDatabase users
File import, HTML zipPages and structure, no databasesHTML export, admin accessPage-only workspaces

The API route is the recommended route if you use databases, because it is the only route that keeps them usable, and it is the route Obsidian recommends for most people. It needs a Notion access token, which you create in the Notion connections dashboard for developers, choosing Access token as the authentication method and selecting your workspace. It needs an internet connection, and it can be slow for large workspaces, because the Notion API rate limits how fast pages can be read, and a workspace with thousands of pages can take hours to import. The wait is worth it for a database user, because the alternative is rebuilding every database by hand.

The file route is simpler and it works offline, because it needs no token and no internet connection, only an HTML export from Notion. It needs admin access to export the whole workspace, and it needs the export format set to HTML, not Markdown, because Obsidian says the Markdown export leaves out important data. The file route turns databases into plain notes, not Bases, which means a task list, a reading list or a client tracker will arrive as a flat page rather than a working database. A workspace that is mostly pages of notes, with few or no databases, will find the file route faster and simpler, and will lose nothing that matters.

Notion to Obsidian import routes showing API route and HTML zip route side by side
Notion to Obsidian import routes showing API route and HTML zip route side by side

Step 1, Audit Your Notion Workspace

The audit is the step that decides the route, because it tells you what you actually have, and most people are surprised by the answer, which is why it comes first in how to switch from notion to obsidian for note taking. List every top-level page, every database, every template and every integration, and note which ones you use weekly, which ones you use monthly, and which ones you have not opened in a year. A workspace with three databases and two hundred pages is a different migration from a workspace with thirty databases and five thousand pages, and the audit is how you find out which one you have.

The audit has a practical output, a list with three columns, item, used or not, and what happens to it. A daily notes template that you use every morning is a rebuild in Obsidian. A project tracker database that you open weekly is an API import as a Base.

A reading list from 2022 that you have not opened since is an archive, not a migration, and it can stay in Notion or be exported as a file and stored outside the vault. A page with embedded content, such as a Figma frame, a Miro board or a Google Doc, needs a note about what happens to the embed, because embeds do not always survive an import, and the link should be preserved even if the preview does not.

Pay special attention to linked databases, because they are the hardest part of the audit. A linked view of a database is not a separate database, and the Importer will import only the primary view of each database, not every linked view you created. A workspace with many linked views will need those views rebuilt in Obsidian Bases after the import, and the rebuilding work grows with every view. List the views that matter, and plan to rebuild them first, because the views are the part of the workspace you actually use, while the underlying database is the part you rarely open directly.

Step 2, Back Up Notion Before You Touch Anything

Back up first, because an import without a backup is a gamble, and the backup takes an hour while the recovery from a failed import without one takes a week. Export the whole workspace from Notion settings, choosing HTML format, turning on Include everything and Create folders for subpages, and save the zip file somewhere safe, on an external drive or a cloud folder that is not the vault. The HTML export is the backup that the Importer itself recommends, and it is also the file you need for the file import route, so the same export serves two purposes.

Export single pages too, for the pages that matter most, because a whole-workspace export can be large and slow to search, while a single-page export is a quick restore for one important document. Open the page, choose Export from the menu, pick HTML, turn on Include subpages, and save the file with the page name. A writer with a manuscript or a student with exam notes should export those pages individually.

Test the backup by opening the zip file and checking that the pages you care about are inside it, with their images and attachments. An export that nobody checks is not a backup, it is a hope, and a hope is not a plan. The check takes ten minutes, and it is the difference between a migration that can be retried and a migration that cannot be undone. Keep the backup for at least a month after the switch, until the vault is proven and the daily habit is settled.

Step 3, Install Obsidian and the Importer

Install Obsidian from its own site, create a vault in a folder you control, and choose the location carefully, because the vault folder is where your notes will live, and moving it later is possible but annoying. A good location is a folder inside your documents, or inside a sync folder if you plan to sync, with a name that describes the vault, such as Notes or Second Brain, rather than a generic name. Do not put the vault inside a cloud folder that syncs partially, because a partially synced vault will produce conflicts that are hard to untangle.

Install the Importer plugin next, from Settings, then Community plugins, searching for Importer, then Install and Enable. Importer is made by the Obsidian team, it is free, and it is the official tool for this job, so there is no reason to use a third-party importer for a standard migration. Open Importer from the command palette or the ribbon, and choose the route you picked in the audit, Notion API for databases, or Notion zip for pages. The plugin will guide you through the token or the file, and it will show a preview of what it found before it imports anything, which is the moment to check that the page count looks right.

Set up the vault basics before you import, because a vault configured after the import will force you to fix notes twice. Turn on the core plugins you need, including Bases for database views, Daily Notes for a daily page, Templates for reusable pages, and Graph View for the link map, and set the daily notes folder and template so the first daily note lands in the right place. Choose a theme you like, and set the editor to your preferred mode, because a vault that looks good on day one is a vault you will open on day two, and the habit is the migration.

Step 4, Run the Import and Check the Result

Run the import, and expect it to take time, because a large workspace can take hours through the API, and the rate limits are set by Notion, not by Obsidian, which is the slowest part of how to switch from notion to obsidian for note taking. Start the import when you have a free afternoon, let it run, and do not interrupt it, because an interrupted import can leave half a workspace in the vault and half still in Notion, with links pointing nowhere. The Importer shows progress as it works, and it reports any pages that failed, so watch the report at the end, and note the failures before you move on.

Check the result in a fixed order, because the order matters. First, count pages in Notion and in the vault, and confirm the counts are close after accounting for archived pages. Second, open ten pages at random, and check that text, headings, images and links survived, with special attention to internal links between pages, because a broken internal link is the most common import problem. Third, open each database as a Base, and check that rows became notes, properties became note properties, and the primary view shows the data you expect. Fourth, check images and attachments, because a missing image is easy to miss until you need it, and the fix is easier on import day than a month later.

Fix the problems you find before you rebuild anything, because a fix applied to the vault before rebuilding will carry through to the rebuilt templates, while a fix applied after rebuilding will need to be repeated. Common fixes include renaming files with long Notion IDs in their names, repairing internal links that point to the old Notion page ID, re-adding images that did not transfer, and rebuilding a database view that imported as a flat list. None of these fixes is difficult, and all of them are faster on import day, when the Notion workspace is still open beside the vault for comparison.

Step 5, Rebuild Templates, Daily Notes and Bases

Rebuilding is the step that turns an imported vault into a working system, and it takes a week of daily use, not an afternoon of setup. Start with daily notes, because they are the habit that holds the system together, and set up a daily note template with the date, a short plan for the day, and a section for notes and tasks, so the first daily note in Obsidian feels as natural as the one in Notion. Use the daily note every day for a week, even if the rest of the vault is still messy, because the daily habit is the system, and the system without the habit is a folder of files.

Rebuild your most-used templates next, with the same fields you used in Notion, but in Markdown rather than in blocks. A meeting note template, a project template and a book note template will cover most personal work, and each one takes ten minutes to build in Obsidian, with properties at the top of the note for the fields that matter. Keep the templates simple, because a template with twenty fields will not be used, while a template with five fields will be used every time. The goal is a template that helps, not a template that impresses.

Rebuild your databases as Bases last, because Bases are the newest part of Obsidian, and they reward a careful setup. A Base shows notes as a table, a list, cards, a kanban board or a map, sorted and filtered by their properties, and the data stays in your Markdown files. Recreate the primary view of each database first, then add the filtered views you actually use. A Base that shows the right notes is a working database.

The Cost Comparison, Before and After

The cost comparison is simple, because Obsidian is free and Notion is not, and the table below works it out for one person over a year, using prices checked in late 2026, before tax, with Obsidian Sync as the only paid line a solo user is likely to need.

Those numbers make the money side of how to switch from notion to obsidian for note taking easy to judge. Notion Plus at 10 dollars a month costs 120 dollars a year, and Notion Business at 20 dollars a month costs 240 dollars a year, while Obsidian app costs nothing, Sync Standard costs 48 dollars a year, and Sync Plus costs 96 dollars a year.

SetupYear one costWhat it buys
Notion Plus120 dollarsUnlimited blocks, 30-day history, AI trial
Notion Business240 dollarsFull AI, SSO, 90-day history
Obsidian app only0 dollarsFree, no sync, one device
Obsidian plus Sync Standard48 dollars1 vault, 1 GB, 1 month history
Obsidian plus Sync Plus96 dollars10 vaults, 10 GB, 12 month history

A solo user who syncs between a laptop and a phone pays 48 dollars a year for Sync Standard, which is less than half of Notion Plus at 120 dollars a year, and a user who needs no sync pays nothing at all. The saving is real, but Sync Standard caps files at 5 MB and keeps one month of version history, while Sync Plus at 96 dollars a year raises those limits to 200 MB and twelve months. A user with large attachments should budget for Plus.

Free sync alternatives exist, and they make the switch cost zero for many people. iCloud, Dropbox, OneDrive, Git and Syncthing can all sync a vault folder between devices at no extra cost, and many Obsidian users sync that way rather than paying for Sync. The trade is that Obsidian Sync offers end-to-end encryption and version history built in, while a file sync service offers neither. A user with sensitive notes should pay for Sync.

Notion and Obsidian cost comparison for one person over a year
Notion and Obsidian cost comparison for one person over a year

What Does Not Survive the Move

Some things do not survive a Notion to Obsidian move, and knowing them before you switch prevents the disappointment of discovering them after. Only the primary view of each database is imported, so secondary views, filtered views and linked views must be rebuilt in Bases by hand. Linked data sources are not imported, so a database that pulls from another database will arrive as a standalone table, and the link must be rebuilt or rethought. A few formula functions, such as name, email and style, do not convert, so a database that relies on those formulas will show errors until the formulas are rewritten in Obsidian syntax.

Real-time collaboration does not survive either, because Obsidian is a local-first app for one person, and there is no shared workspace where two people edit the same page at the same time. A person who collaborates daily in Notion will miss that, and no plugin fully replaces it, although shared vaults through Sync and Git allow a form of collaboration with more friction. Comments, mentions and real-time cursors are Notion features, and they have no direct equivalent in Obsidian.

Notion AI does not survive either, because Obsidian has no built-in AI, and the AI features in Notion, including the agent, meeting notes and enterprise search, are tied to the Notion platform. Obsidian has community plugins that add AI, and many users connect Claude or ChatGPT to their vault through a plugin, but the integration is not built in, and it needs setup. A person who relies on Notion AI daily should budget for a separate AI subscription after the switch, and should test the plugin route before committing to the move, because the AI workflow is the part of Notion that is hardest to replace.

A Switch Checklist You Can Copy

Use this checklist for your migration, and keep a copy with the project plan.

1. Audit the workspace and pick the API or the HTML zip route. 2. Export the whole workspace as HTML and save the backup. 3. Install Obsidian, create the vault and enable Importer. 4. Run the import and note any pages that failed. 5. Check counts, links, images and database views by hand. 6. Rebuild daily notes, templates and Bases in the vault. 7. Choose Sync, iCloud, Git or another service for devices. 8. Work in Obsidian daily for two weeks and keep Notion as backup. 9. Close Notion only when the vault is proven and the habit is set.

A person who can tick all nine boxes has migrated well, and a person who skips any of them has a gap that will appear later, usually when the missing page is needed most. Keep the checklist with the project plan, and review it weekly during the migration, because a migration is a project, and a project without a checklist is a project that drifts. The checklist is the difference between a switch that takes a weekend and a switch that takes a month.

Notion to Obsidian nine point switch checklist from audit to closing Notion
Notion to Obsidian nine point switch checklist from audit to closing Notion

Related Guides

Keep exploring with these guides on Stratilyze:

Frequently Asked Questions

Is Obsidian really free for personal and commercial use?

Yes, the Obsidian app is free for any purpose, personal or commercial, with no account, no feature limits and no trial clock, according to the vendor license page. The only paid parts are optional, Sync from 4 dollars per user a month billed yearly, Publish at 8 dollars per site a month yearly, and two supporter licences that Obsidian says you do not need. A commercial licence at 50 dollars per user a year is optional, and it supports development without adding any feature. You are not required to pay for commercial use.

Should I export Notion as Markdown or HTML for Obsidian?

Export as HTML, not Markdown, because Obsidian says the Markdown export leaves out important data, and the Importer is built to read the HTML export. Set the export format to HTML, choose Include everything, turn on Create folders for subpages, and save the zip file. The same HTML export serves as your backup and as the file for the zip import route, so one export covers both purposes. A Markdown export will import, but it will lose data that the HTML export keeps, and the loss is not always visible until later.

What happens to my Notion databases in Obsidian?

Databases import as Obsidian Bases on the API route, with each database becoming a folder with a Base file inside, and its rows becoming Markdown notes with properties. Only the primary view of each database is imported, linked data sources are not imported, and a few formula functions do not convert, so the Base will need checking and rebuilding after the import. On the HTML zip route, databases do not become Bases at all, and they arrive as plain notes, so a database user should always choose the API route, even though it takes longer.

Can I sync Obsidian between my phone and laptop for free?

Yes, through iCloud, Dropbox, OneDrive, Git or Syncthing, all of which sync a vault folder between devices at no extra cost, and many Obsidian users sync that way. Obsidian Sync costs 4 dollars a month billed yearly for Standard, with 1 vault, 1 GB of storage and one month of version history, and it offers end-to-end encryption and built-in version history that a file sync service does not. A user with sensitive notes should pay for Sync. A user with plain notes can sync free and save the money.

How long does a Notion to Obsidian migration take?

A personal workspace with a few hundred pages can finish the import in an afternoon, and a large workspace with many databases can take a day or more, because the Notion API rate limits slow the import. The rebuilding work takes longer than the import, with templates, daily notes and Bases needing a week of daily use to settle, and the full switch takes about three weeks from start to finish. The import is the fast part. The habit is the slow part.

Should I delete Notion after switching to Obsidian?

No, not immediately, because the backup and the reference copy are worth keeping until the vault is proven. Keep Notion as a read-only backup for at least a month after the switch, and keep the HTML export as well, so any page that was missed can be found and re-imported. Close the Notion subscription only when the vault has carried your daily work for two weeks without a gap, and keep the export file even after you cancel.

A Final Word Before You Switch

Switching from Notion to Obsidian is a change of ownership before it is a change of software, and the right question is not which app has more features, but which model fits the way you think. A person who works alone, writes daily, values files they own and wants a system that works offline should switch, because Obsidian gives them their notes as files, and files are forever. A person who collaborates daily, relies on Notion AI, and lives in shared workspaces should stay, because Obsidian will not replace those features, and the switch will cost more than it saves.

If you decide to switch, follow the order in this guide, audit, back up, install, import, check, rebuild, sync and live in the vault for two weeks before you close Notion. Start with the audit today, and give the switch the three weeks it deserves, because that careful pace is what makes how to switch from notion to obsidian for note taking succeed. A note system done well is invisible, and it lets you think.

Leave a Comment